Frequently asked questions.
Straight answers to the questions we hear most. Can't see yours? Call 07518 458 787 or send us a message.
General
The basics
How much does a ground investigation cost?
It depends on the size of the site, the number and depth of boreholes or pits, access and the testing needed. A single soakaway test or trial pit for an extension is a small job; a full investigation for a development is a bigger one. Send us the site address and what you're building and we'll give you a clear quote.
Do I need a soil test for my extension?
Often, yes. Building control may want to know the ground can carry your foundations, especially on clay, made ground or near trees, and if surface water is going to a soakaway they'll usually want a soakaway test. A trial pit or a window sample is often all it takes.
What's the difference between a percolation test and a soakaway test?
A percolation test checks whether the ground can take the treated water from a septic tank or treatment plant through a drainage field. A soakaway test, usually to the BRE 365 method, checks how quickly surface water from roofs and drives will soak away, so a soakaway can be designed.
Do you work outside Wigan?
Yes. We're based in Wigan and work across Greater Manchester, Merseyside, Lancashire and Cheshire. Tell us where your site is and we'll let you know.
Can you work in a back garden with no vehicle access?
Yes. Where access is too tight even for our compact rig, we use a hand-held window sampling system that recovers samples in the same tubes as the rig.
Site investigation
Site investigation →
Do I need a site investigation for a house extension?
Often, yes. Building control or your structural engineer may ask for a trial pit or borehole to confirm the soil and its depth before signing off the foundation design, especially on clay, near trees, or on filled or mined ground. It is decided case by case.
What is the difference between Phase 1 and Phase 2?
Phase 1 is a desk study and site walkover using maps, records and history. Phase 2 is the intrusive work on site: trial pits, boreholes, sampling and testing.
How much does a site investigation cost?
It depends on the size of the site, the number and depth of exploratory holes, access and the testing needed. Send us the address and what you are building and we will give you a clear quote. Our guide on ground investigation costs explains what drives the price.
Cable percussion drilling
Cable percussion drilling →
How deep will you drill?
It depends on the structure and the ground. The borehole needs to go below the depth the foundation loads will affect, and your engineer sets the depth. With cable percussion we can form boreholes up to 60m deep where access and ground conditions allow.
What is an SPT N value?
A count of hammer blows to drive a standard sampler 300mm into the ground. It gives an indication of how dense or stiff the ground is and is used in foundation and pile design.
Why cable percussion rather than window sampling?
Cable percussion goes deeper, takes larger and better-quality samples, and allows SPTs in deeper soils. Window sampling is quicker and suits shallow investigations and tight access.
Rotary drilling and coring
Rotary drilling and coring →
Why open hole rather than coring?
Open hole is faster and cheaper, and it is the usual way to prove whether there are voids or broken ground at seam level. Coring is used when you need to see and test the rock itself.
How deep do you drill for mine workings?
Deep enough to prove the seams of concern and enough sound rock above them, as set out by the coal mining risk assessment or your engineer. There is no single fixed depth.
Do you need a permit to drill on my site?
Only if the boreholes are expected to enter or disturb coal seams, workings or mine entries. We will tell you if your site needs one and allow for it in the programme.
Window sampling
Window sampling →
Can you get into my back garden?
Very likely. Our compact rig is designed for restricted access, and where even that will not fit, we can use a hand-held window sampling system.
How much mess will it make?
Very little. The holes are small in diameter and are backfilled when we finish.
Is window sampling enough for my extension?
Often, for shallow foundations in typical soils. For piles or deep or variable ground, your engineer may want deeper boreholes.
Dynamic probing
Dynamic probing →
What does dynamic probing tell me?
How the ground's resistance changes with depth, including where it firms up and where there are soft or loose layers. That helps the engineer choose a foundation depth.
Is it a substitute for boreholes?
No. It gives no samples, so it is used with window samples or boreholes, not instead of them.
How deep can it go?
Until the probe refuses or reaches the depth required for your project.
Trial pits
Trial pits →
Trial pits or boreholes?
Trial pits are quick and good value, and show the ground in detail to a few metres. Boreholes are needed for anything deeper or where a pit is not practical.
Will my garden be left in a mess?
Pits are backfilled with the dug material and compacted when we finish. Talk to us about access and reinstatement when you ask for a quote.
Does someone go down into the pit?
Not into an unsupported excavation. We log and sample from the surface or the excavator bucket.
Percolation testing
Percolation testing →
Is a percolation test the same as a soakaway test?
No. A percolation test to Part H and BS 6297 is for septic tank and treatment plant drainage fields. A BRE 365 soakaway test is for rainwater soakaways. Building control will not accept one in place of the other.
What is a good percolation test result?
Part H guidance says drainage fields should only be used where the average Vp is between 12 and 100. BS 6297 and the Environment Agency general binding rules use a minimum of 15.
How long does a percolation test take?
At least two days on site, because the test hole has to soak overnight before the timed tests are run.
Soakaway testing
Soakaway testing →
Is a soakaway test the same as a percolation test?
No. BRE 365 is for rainwater soakaways. A Part H and BS 6297 percolation test is for septic tank and treatment plant drainage fields, and one cannot be used in place of the other.
How long does a soakaway test take?
BRE 365 needs three fill-and-drain cycles on the same or consecutive days, so it is usually a day or two on site, depending on how quickly the ground drains.
What if my ground does not drain?
The drainage hierarchy moves on to other options, such as a watercourse or sewer connection. Your engineer or building control will advise on the route.
Laboratory testing
Laboratory testing →
Why do you need to test my clay?
Plasticity tells the engineer how much the clay will shrink and swell. Near trees, that sets how deep the foundations need to go.
What is the sulfate test for?
It tells the engineer which concrete mix to specify, so the foundations are not attacked by chemicals in the ground.
Can you test samples I already have?
Get in touch with the details of the samples and the tests you need and we will let you know.
Contaminated land
Contaminated land →
Why has the council put a contamination condition on my planning permission?
Councils commonly attach conditions requiring a desk study, investigation and, where needed, remediation before work starts, following the Environment Agency's LCRM guidance.
Is my site contaminated?
A desk study looks at the site's history to judge whether there is a plausible risk. Sampling and testing then confirm it either way.
Why can't you take one gas reading?
Gas levels change with the weather and air pressure, so several visits, including during falling pressure, are needed to understand the site.
Coal mining investigation
Coal mining investigation →
Is my site in a high risk area?
Check the address on the Mining Remediation Authority's interactive map, or send it to us and we will check it. The status is set site by site, not by town.
Do I need a coal mining risk assessment for my extension?
Householder applications are exempt from the automatic requirement, but the council or building control can still ask for one if they think it is needed.
Do you need a permit to drill on my site?
Only if the boreholes are expected to enter or disturb coal seams, workings or mine entries. We will tell you if your site needs one.
